Skip Navigation Links

Report from iQA Using CT-SIM/Check


Site: Demo Site
Machine: CT SIM
--
User Data Entry Completed:2021-07-14 22:36:29
Imaged: 7/7/2021 12:34 PM
Overall Status:Failed
1.PassedHU Calibration (Cylinder Mean)54.43Image for CylinderMean  Trend
2.PassedHU Uniformity (Cylinder Standard Deviation)9.61Image for CylinderStdDev  Trend
3.PassedImage OrientationHFSImage for ScanOrient  Image for ScanOrient  Trend
4.PassedPlug 1 HU Mean-687.90Image for P1Mean  Trend
5.PassedPlug 2 HU Mean-489.92Image for P2Mean  Trend
6.PassedPlug 3 HU Mean664.67Image for P3Mean  Trend
7.PassedPlug 4 HU Mean58.20Image for P4Mean  Trend
8.PassedPlug 4 Inner HU Mean57.75Image for P4InnerMean  Trend
9.PassedPlug 4 Inner StDev5.23Image for P4InnerStdDev  Trend
10.PassedScan Center Lateral (mm)0.0Image for CtrX  Image for CtrX  Image for CtrX  Trend
11.PassedScan Center Vertical (mm)-128.4Image for CtrY  Image for CtrY  Trend
12.FailedScan Center Longitudinal (mm)-595.0Image for CtrZ  Image for CtrZ  Trend
13.PassedLateral Scale (%)100.0Image for ScaleX  Trend
14.PassedVertical Scale (%)99.7Image for ScaleY  Trend
15.FailedLongitudinal Scale (% Ratio of Slice Spacing)92.6Image for ScaleZ  Trend
16.PassedWire Width Ratio - Sensitivity Profile1.651Image for WireWidthRatio  Trend
17.PassedPitch (°)-0.1Image for RotX  Trend
18.PassedYaw (°)0.0Image for RotY  Trend
19.PassedRoll (°)0.1Image for RotZ  Trend
20.PassedTarget Pt Left Tower, Lateral (mm)-177.9Image for TgtOffX  Trend
21.PassedTarget Pt Left Tower, Vertical (mm)149.4Image for TgtOffY  Trend
22.PassedTarget Pt Left Tower, Longitudinal (mm)49.6Image for TgtOffZ  Trend

*** End of Protocol ***