Skip Navigation Links

Report from iQA Using CT-SIM/Check


Site: Demo Site
Machine: CT SIM
--
User Data Entry Completed:2021-04-30 04:40:42
Imaged: 4/28/2021 9:02 AM
Overall Status:Failed
1.PassedHU Calibration (Cylinder Mean)56.11Image for CylinderMean  Trend
2.PassedHU Uniformity (Cylinder Standard Deviation)8.80Image for CylinderStdDev  Trend
3.PassedImage OrientationHFSImage for ScanOrient  Image for ScanOrient  Trend
4.PassedPlug 1 HU Mean-688.02Image for P1Mean  Trend
5.PassedPlug 2 HU Mean-490.71Image for P2Mean  Trend
6.PassedPlug 3 HU Mean673.05Image for P3Mean  Trend
7.PassedPlug 4 HU Mean62.77Image for P4Mean  Trend
8.PassedPlug 4 Inner HU Mean60.66Image for P4InnerMean  Trend
9.PassedPlug 4 Inner StDev7.11Image for P4InnerStdDev  Trend
10.PassedScan Center Lateral (mm)-0.5Image for CtrX  Image for CtrX  Image for CtrX  Trend
11.PassedScan Center Vertical (mm)-127.0Image for CtrY  Image for CtrY  Trend
12.FailedScan Center Longitudinal (mm)-594.8Image for CtrZ  Image for CtrZ  Trend
13.PassedLateral Scale (%)100.2Image for ScaleX  Trend
14.PassedVertical Scale (%)100.7Image for ScaleY  Trend
15.PassedLongitudinal Scale (% Ratio of Slice Spacing)96.6Image for ScaleZ  Trend
16.PassedWire Width Ratio - Sensitivity Profile1.508Image for WireWidthRatio  Trend
17.PassedPitch (°)-0.3Image for RotX  Trend
18.PassedYaw (°)-0.1Image for RotY  Trend
19.PassedRoll (°)0.2Image for RotZ  Trend
20.PassedTarget Pt Left Tower, Lateral (mm)-178.0Image for TgtOffX  Trend
21.PassedTarget Pt Left Tower, Vertical (mm)149.0Image for TgtOffY  Trend
22.MarginalTarget Pt Left Tower, Longitudinal (mm)48.8Image for TgtOffZ  Trend

*** End of Protocol ***